A fence fails at its weakest weld and its thinnest coating. So we check material, welds, zinc, powder, fitment and packing — eight documented steps before your container closes.
Steel wire and tube arrive with mill certificates; no cert, no production.
Wire diameter and zinc coating are measured on incoming lots, before weaving or welding.
Weld strength and panel dimensions are checked in-process on every production batch.
Magnetic gauge readings across dipped panels; our standard minimum is 300 g/m² zinc.
Film thickness and cross-hatch adhesion tests on coated panels; color checked against the RAL standard.
Feet, clamps, gates and fixings are trial-fitted so nothing surprises your crew on site.
Every bundle is counted, labeled and inspected before wrapping — the packing list matches reality.
Container loading is photographed stage by stage; you see exactly how your order was loaded.
ISO 9001 quality management runs the system; CE compliance and SGS third-party testing are available for any order that needs independent verification.



Yes — coating thickness reports and dimensional QC records are available per lot, and SGS third-party inspection can be arranged before shipment.
Yes — our quality management system runs under ISO 9001, and CE compliance documentation is available for markets that require it.
Standard tolerances are stated on the shop drawings we issue before production; tighter project tolerances are confirmed in writing before we start.
Yes — production-line samples of panels, mesh and fixings can be couriered so you can verify coating and welds before committing.
The loading photo record and bundle labels make discrepancies visible immediately; verified shortages or defects are replaced or credited on the next shipment.
Ask for our QC checklist, a sample set, or an SGS inspection arrangement with your quote — replies within 24 hours.